Unit:
|
Longyan High-tech Zone Economic Development Bureau
|
|
|
Project Area:
|
longyan-xinluo Longyan High-tech Zone, Gaopo Area
|
|
|
Industry:
|
New Energy Industry
|
|
|
Type of Project:
|
New Project
|
|
|
Cooperation Mode:
|
Individual Proprietorship,Joint Venture
|
|
|
Nature of Project:
|
Encourage
|
|
|
Working Progress in Prior Period:
|
The Project proposal has been completed
|
|
|
Total Investment:
|
1150 million yuan
|
|
|
Expected to Attract Investment:
|
1150 million yuan
|
|
|
Content and Scale:
|
The project will build an annual output of 30GW ultra-fast charging piles (5000 sets) and 3GW energy storage system production base. After the project is put into operation, it will achieve an annual output value of 2.5 billion yuan and an annual tax of about 50 million yuan.
|
|
Fujian leverages its resource advantages to vigorously develop new energy and renewable energy, focusing on building a significant energy base along the southeastern coast and constructing a diversified clean energy supply system of “hydro, nuclear, wind, solar, gas, and storage.” By the end of 2025, installed capacity for offshore wind power reached 3.83 million kilowatts, with wind energy utilization hours ranking first nationwide for 12 consecutive years. As of the end of 2025, Fujian's power generation installed capacity exceeded 100 million kilowatts for the first time, reaching 100.49 million kilowatts. The proportion of clean energy installed capacity and generation in Fujian reached 65.8% and 57.5%, respectively, both ranking first in East China. Renewable energy has long maintained full consumption. The Fujian Three Gorges Wind Power International Industrial Park became the first industrial park in China to achieve “carbon neutrality.”