Unit:
|
Wuping County Project Service Center
|
|
|
Project Area:
|
longyan-wuping Wuping High-tech Park (Shifang Park)
|
|
|
Industry:
|
New Energy Industry
|
|
|
Type of Project:
|
New Project
|
|
|
Cooperation Mode:
|
Individual Proprietorship,Collaborate
|
|
|
Nature of Project:
|
Encourage
|
|
|
Working Progress in Prior Period:
|
The site selection, planning and feasibility study report preparation have been completed
|
|
|
Total Investment:
|
1000 million yuan
|
|
|
Expected to Attract Investment:
|
1000 million yuan
|
|
|
Content and Scale:
|
The total land area of the project is about 95 mu, mainly for the construction of production plant, office room, staff shift room, raw material warehouse and finished product warehouse, etc., and the purchase of related supporting automatic production equipment and testing equipment. The annual output of 25,000 tons of sodium electric cathode material, 20,000 tons of sodium electric cathode material production capacity.
|
|
Fujian leverages its resource advantages to vigorously develop new energy and renewable energy, focusing on building a significant energy base along the southeastern coast and constructing a diversified clean energy supply system of “hydro, nuclear, wind, solar, gas, and storage.” By the end of 2025, installed capacity for offshore wind power reached 3.83 million kilowatts, with wind energy utilization hours ranking first nationwide for 12 consecutive years. As of the end of 2025, Fujian's power generation installed capacity exceeded 100 million kilowatts for the first time, reaching 100.49 million kilowatts. The proportion of clean energy installed capacity and generation in Fujian reached 65.8% and 57.5%, respectively, both ranking first in East China. Renewable energy has long maintained full consumption. The Fujian Three Gorges Wind Power International Industrial Park became the first industrial park in China to achieve “carbon neutrality.”