Unit:
|
Eastern Economic and Technological Development Zones
|
|
|
Project Area:
|
ningde No. 26 Funing North Road, Dongqiao Development Zone
|
|
|
Industry:
|
New Energy Industry
|
|
|
Type of Project:
|
New Project
|
|
|
Cooperation Mode:
|
Collaborate
|
|
|
Nature of Project:
|
Permit
|
|
|
Working Progress in Prior Period:
|
Pre-preparation stage
|
|
|
Total Investment:
|
19.22 million yuan
|
|
|
Expected to Attract Investment:
|
19.22 million yuan
|
|
|
Benefit Analysis:
|
none
|
|
|
Reason and Condition:
|
none
|
|
|
Content and Scale:
|
The 8,9, and 1012 floors of the north In the north of the building, experimental schools, parking buildings, north of the new area of the standard factory building construction of distributed PV, roof area of 37,600 square meters, construction scale of 4.11 MW, the construction includes single crystal PERC half-chip multi-main-grid PV module, inverter supporting electrical system, etc. .
|
|
|
Others:
|
none
|
|
Fujian leverages its resource advantages to vigorously develop new energy and renewable energy, focusing on building a significant energy base along the southeastern coast and constructing a diversified clean energy supply system of “hydro, nuclear, wind, solar, gas, and storage.” By the end of 2025, installed capacity for offshore wind power reached 3.83 million kilowatts, with wind energy utilization hours ranking first nationwide for 12 consecutive years. As of the end of 2025, Fujian's power generation installed capacity exceeded 100 million kilowatts for the first time, reaching 100.49 million kilowatts. The proportion of clean energy installed capacity and generation in Fujian reached 65.8% and 57.5%, respectively, both ranking first in East China. Renewable energy has long maintained full consumption. The Fujian Three Gorges Wind Power International Industrial Park became the first industrial park in China to achieve “carbon neutrality.”