Unit:
Eastern Economic and Technological Development Zones
Project Area:
ningde No. 26 Funing North Road, Dongqiao Development Zone
Industry:
New Energy Industry
Type of Project:
New Project
Cooperation Mode:
Collaborate
Nature of Project:
Permit
Working Progress in Prior Period:
Pre-preparation stage
Total Investment:
130.6 million yuan
Expected to Attract Investment:
130.6 million yuan
Benefit Analysis:
none
Reason and Condition:
none
Content and Scale:
The 8,9, and 1012 floors of the north supporting factory building (site A7) will be used to Gross leasable area a total of 6,683 square meters of construction space for the Dongqiao The total land area of the project is about 5,360.72 square meters (12.54 mu) , with a total construction area of 28,179.69 square meters, including 12,785.69 square meters of office Gross leasable area and 950 square meters of supporting zero-carbon smart management platform, supporting lithium, electricity, new energy industry, dual-carbon co-innovation center Gross leasable area 4,035 square meters, dual-carbon production, education and research platform construction area of 1,842 square meters, underground parking construction area of 8,532 square meters (including 480 square meters of equipment rooms) , the density is 37.58% , the volume ratio is 2.35. The main works include building works, structural works, foundation pit support, decoration works, water supply and drainage works, electrical works, ventilation and air conditioning, fire protection works, outdoor landscape works, greening works, Night View Works, intelligent works (including equipment) and sponge city, etc. .
Others:
none
Industry

New Energy

Fujian leverages its resource advantages to vigorously develop new energy and renewable energy, focusing on building a significant energy base along the southeastern coast and constructing a diversified clean energy supply system of “hydro, nuclear, wind, solar, gas, and storage.” By the end of 2025, installed capacity for offshore wind power reached 3.83 million kilowatts, with wind energy utilization hours ranking first nationwide for 12 consecutive years. As of the end of 2025, Fujian's power generation installed capacity exceeded 100 million kilowatts for the first time, reaching 100.49 million kilowatts. The proportion of clean energy installed capacity and generation in Fujian reached 65.8% and 57.5%, respectively, both ranking first in East China. Renewable energy has long maintained full consumption. The Fujian Three Gorges Wind Power International Industrial Park became the first industrial park in China to achieve “carbon neutrality.”