Unit:
|
Shilla district Project construction service center
|
|
|
Project Area:
|
longyan-xinluo
|
|
|
Industry:
|
New Energy Industry
|
|
|
Type of Project:
|
New Project
|
|
|
Cooperation Mode:
|
Individual Proprietorship,Joint Venture
|
|
|
Nature of Project:
|
Encourage
|
|
|
Working Progress in Prior Period:
|
The project site selection, market research and pre-feasibility study report have been completed
|
|
|
Total Investment:
|
500 million yuan
|
|
|
Expected to Attract Investment:
|
500 million yuan
|
|
|
Content and Scale:
|
(1) High-speed service area: Photovoltaic carports will be set up in 8 high-speed service areas, and 160 kW fast DC charging pile and energy storage power station will be installed to realize rapid charging of vehicles.
(2) Ecological parking lot: the current ground parking lot is mainly selected for construction, with photovoltaic carport, 120 kW fast DC charging pile and energy storage power station are set up to realize the rapid charging of vehicles.
|
|
Fujian leverages its resource advantages to vigorously develop new energy and renewable energy, focusing on building a significant energy base along the southeastern coast and constructing a diversified clean energy supply system of “hydro, nuclear, wind, solar, gas, and storage.” By the end of 2025, installed capacity for offshore wind power reached 3.83 million kilowatts, with wind energy utilization hours ranking first nationwide for 12 consecutive years. As of the end of 2025, Fujian's power generation installed capacity exceeded 100 million kilowatts for the first time, reaching 100.49 million kilowatts. The proportion of clean energy installed capacity and generation in Fujian reached 65.8% and 57.5%, respectively, both ranking first in East China. Renewable energy has long maintained full consumption. The Fujian Three Gorges Wind Power International Industrial Park became the first industrial park in China to achieve “carbon neutrality.”