Unit:
|
Shanghang County key project development service Center
|
![]() |
Project Area:
|
longyan-shanghang Nangang Jintong Industrial Park
|
|
Industry:
|
Other
|
|
Type of Project:
|
New Project
|
|
Cooperation Mode:
|
Individual Proprietorship,Collaborate
|
|
Nature of Project:
|
Encourage
|
|
Working Progress in Prior Period:
|
The project site selection, planning and feasibility study report has been completed, and is promoting investment.
|
|
Total Investment:
|
141.2 million USD
|
|
Expected to Attract Investment:
|
141.198 million USD
|
|
Content and Scale:
|
The project covers an area of about 40 mu, with a total construction area of 25,000 square meters. Construction project is mainly composed of production workshop, auxiliary engineering, comprehensive engineering, public auxiliary engineering, etc. Among them, there is a new energy carbon material deep processing workshop, a production workshop, an auxiliary production workshop, and a three-storey complex building. The auxiliary works include open storage yard, road, greening, wall, water supply and drainage pipe network, pipeline laying, etc. Purchase 10 continuous casting furnaces, 4 large drawing machines, 8 coarse drawing machines, 40 medium drawing machines, 60 thin and drawing machines, 60 annealing furnaces and 10 sheet pressing machines. Annual output of 45 tons of bond alloy, silver, copper, and gold wire.
|