Unit:
|
People's Government of Hetang Town
|
![]() |
Project Area:
|
ningde Gutian County, Ningde City
|
|
Industry:
|
Tourism Industry
|
|
Type of Project:
|
Expansion Project
|
|
Cooperation Mode:
|
Individual Proprietorship,Joint Venture
|
|
Nature of Project:
|
Encourage
|
|
Working Progress in Prior Period:
|
The feasibility study and social stability report of the project have been completed. The land use approval, feasibility study initiation and social stability approval for the project have been obtained.
|
|
Total Investment:
|
88.33 million yuan
|
|
Expected to Attract Investment:
|
40 million yuan
|
|
Content and Scale:
|
The infrastructure improvement project for rural tourism in Hetang, Gutian County involves four villages in Hetang Town, Gutian County, namely Qian Ge Village, Jia Long Village, Tian Di Village and Zhang Ting Village. The specific construction scale and content are as follows: The specific renovation content of Qian Ge Village includes: It is planned to build a hot spring health and wellness center with a construction area of approximately 5,000 square meters. Renovate and upgrade the water supply and drainage pipelines, roads, power grids and communication pipelines, as well as their facades in the village. Build an ecological parking lot with a construction area of 1,500 square meters. Build a viewing platform with an area of 15 square meters. Build one waterwheel; Build three glass houses; Build a new lakeside walkway approximately 825 meters in length. Upgrade and renovate the current landscape of approximately 575 meters of the mountain climbing trail. Upgrade and renovate the current landscape of approximately 200 square meters of the Seven-star Pool. Renovate three ancient residences in the village. The specific renovation contents of Jialong Village include: upgrading and renovating the 1,200-meter farm road in the tea garden; The existing landscape of the lakeside Park will be upgraded and renovated, with a renovation area of approximately 1,936 square meters. The existing landscape of Jixiang Park will be upgraded and renovated, with a renovation area of approximately 500 square meters. Renovate one existing ancient residence. An ecological parking lot with a construction area of 1,257 square meters. Renovate and upgrade the water supply and drainage pipelines, roads, power grids and communication pipelines, as well as their facades in the village. A new children's jungle adventure park with an area of approximately 2,500 square meters will be built. A new glass slide approximately 600 meters long will be built. Build a new waterwheel house. The existing landscape of Motherly Love Park will be upgraded and renovated, with a renovation area of approximately 1,280 square meters. Build a 150-square-meter water curtain cave landscape. Renovate the current Dasheng Cultural Palace. The specific renovation contents of Tiandi Village include: upgrading and renovating the existing landscape of the Suspension Bridge Park, with a renovation area of approximately 1,750 square meters. The landscape of the existing tourist service center will be renovated, covering an area of approximately 738 square meters. A new hiking trail 1,232 meters long has been built. Renovate the cultural palace, which currently covers an area of approximately 2,440 square meters. Renovation area; Renovate the former residences of famous people, which currently cover an area of approximately 1,097 square meters. Upgrade and renovate the ancient residential alley with a length of approximately 188 meters. Renovate the part of the rafting project in Tiandi Village that connects with the suspension bridge park, with a renovation area of approximately 6,930 square meters. Carry out landscape improvement and renovation on the agricultural culture park with an area of approximately 44,757 square meters. Upgrade and renovate the martyrs' monument, which covers an area of approximately 200 square meters. Enhance the landscape of the folk waterwheel with a site area of approximately 134 square meters. The living environment was renovated with landscape greening, covering an area of approximately 1,253 square meters. The specific renovation contents of Zhangting Village include: upgrading and renovating approximately 1,038 square meters of the ancient stage in Zhangfengjing. Clean and enhance the landscape of a 141-meter-long waterway. A new mountain circular walkway of approximately 390 meters in length has been built. Enhance the landscape of Sun Moon Lake, which currently covers an area of approximately 408 square meters. Carry out street surface restoration and green landscape renovation on the martyrs' former residence, which covers an area of approximately 801 square meters. Renovate an ancient building with an area of approximately 2,681 square meters. The landscape of the existing tourist service center will be renovated, covering an area of approximately 981 square meters. Renovate and upgrade the picking garden with an area of approximately 34,353 square meters. The landscape greening and living facilities of the human settlement environment will be renovated and upgraded, with a total renovation area of approximately 1,652 square meters.
|
In the first three quarters of 2024, Fujian Province's services sector maintained steady growth, accounting for over half of the regional economy. The revenue of service enterprises above the designated size showed strong expansion, with robust support for key industries. The added value of our province's services sector reached RMB 2,026.768 billion, a year-on-year increase of 4.7%, representing 50.4% of the regional GDP. In the first three quarters, 8,390 service enterprises above the designated size achieved a total operating revenue of RMB 735.36 billion, up 11.6% year-on-year, 4.4 percentage points higher than the national average and ranking first in China. Key industries played a prominent role, generating RMB 483.98 billion in revenue, a 19.4% increase, 9.5 percentage points above the national average, and also ranking first nationwide. Their contribution to the revenue growth of service enterprises above the designated size reached 103.2%.